TRAILSTART
The Joseph Gibbons Centre

The centre on Livingston Drive.

A former day centre beside Lark Lane, empty since 2012. We want to bring it back into everyday use, step by step, as funding and volunteers allow.

The building today

The Joseph Gibbons Centre is a single-storey building on Livingston Drive, Aigburth. It closed as a day centre on 31 March 2012 and has stood empty since.

Floor space397 m² gross internal area (Council figure)
SiteAbout 430 m², with parking shared with the NHS health centre next door
RoomsA hall, kitchen, smaller rooms, offices and storage
SettingLark Lane Conservation Area, so outside changes need planning permission
OwnerLiverpool City Council
The Joseph Gibbons Centre today: a single-storey brick building with boarded windows and trees behind
The building today. Photograph: Liverpool City Council.
Community Asset Transfer

How we hope to take it on

A Community Asset Transfer lets a council lease an unused building to a community organisation that will put it to good use. We sent our business plan to Liverpool City Council in November 2026 and expect a decision in 2027.

Nothing is agreed yet. The lease, funding and building works all still need to be secured.

  1. Phase 1: Scouts first

    The Scout Group moves in and uses the whole building, paying its running costs: Scouting three evenings a week, a base for our litter picks, gardening and family projects, and the first community sessions. Spaces are heated and lit only when in use.

  2. Phase 2: making it fit for everyone

    Surveys, design, planning permission and fundraising, then works done in stages around Scout nights: fire detection and emergency lighting, heating, water and toilets, step-free entrances, accessible toilets, secure access, flooring and storage.

  3. Phase 3: a hub for everyone

    The café, rooms for hire and all six TrailStart strands running: Scouting, family, connect, learn, grow and market.

Accessible, green and local

  • Step-free access, accessible toilets and clear routes through the building, checked by an access audit before and after the works.
  • Energy-efficient heating and lighting, so the building costs less to run and uses less energy.
  • Covered cycle parking and a bike repair station, because most people will walk or cycle from L17, L19 and L8.
  • Gardens and planters outside, looked after through our Grow strand.

Concept drawings show one way the refurbished building could work. They are illustrative only: final designs depend on surveys, funding and permissions.

Concept image of a café with timber walls, green chairs and a coffee counter
The café: concept image, illustrative only.
Concept image of the hall refurbished with a light floor, timber beams and storage
The hall: concept image, illustrative only.